Peter Norman Personnel

ABBOTT'S ROAD PROJECT

PNP provided APA Group with welding supervision services during the construction and tie-in of a 3.8 km, 450NB, Class 600 natural gas pipeline that increases the capacity of the existing Dandenong to Crib Point Pipeline system. The pipeline runs from a hot tap off take on the existing 300NB pipeline and reconnects via a hot tap to the existing 300NB pipeline. This section was the first stage of a general augmentation of the Dandenong to Crib Point Pipeline to increase capacity in the pipeline system servicing the Mornington Peninsula region, to deal with increased winter demand.

Services Provided

Welding Supervisor