DANDENONG LNG GAS STORAGE FACILITY OPERATIONS, VIC

APA dandenong ing

DANDENONG LNG GAS STORAGE FACILITY OPERATIONS, VIC

APA’s Dandenong LNG Gas Storage Facility provides gas buyers, including gas retailers, flexibility in the East Australian gas market, by providing options to manage gas supply and demand during production outages or emergencies and peak demand periods.

Strategically located on the Melbourne Inner Ring Main, the facility is ideally situated to enable the rapid vaporisation of LNG and subsequent injection of natural gas into the pipeline system.

Natural gas is taken from the Longford Dandenong Pipeline, cleaned to remove moisture and carbon dioxide, and then cooled to -163 degrees. At this temperature it becomes a liquid which is then stored in the very large onsite above-ground LNG tank. The tank can hold 680 terajoules of LNG (12,400 tonnes) and can be topped up at a rate of up to 8.2 TJ/day. To supply gas into the East Coast gas market, the LNG is warmed to be turned back into natural gas. The combined injection capacity of the plant is 237 TJ/. This is equivalent to the average daily gas consumption of 1.5 million households. The plant can be injecting into the market at full capacity within an hour of start-up. APA also sells LNG for remote applications and heavy road transport as an alternative to diesel and LPG. The facility has an LNG tanker loading capacity of around 100 tonnes of LNG per day. The facility’s onsite control centre is manned 24 hours per day. PNP has provided APA with various personnel to undertake works and both operate the facility over the years.

Services Provided

Construction superintendent,

mechanical design draftsperson,

materials expediter,

LNG controllers

BROOKLYN-LARA GAS PIPELINE, VIC

Brooklyn-Lara Gas Pipeline, VIC

BROOKLYN-LARA GAS PIPELINE, VIC

Following on from our preliminary work for construction contractor, AJ Lucas, PNP assisted the asset owner during delivery of the construction phase. PNP fulfilled construction inspection services for APA Group during construction of the project, which went from October 2007 to mid 2008.

Services Provided

Clear & grade inspector,

welding inspectors,

coating inspectors,

lower-in inspector,

backfill inspector,

Document Controller

ABBOTTS ROAD AUGMENTATION PIPELINE, DANDENONG, VIC

Abbott's Road

ABBOTT'S ROAD PROJECT

PNP provided APA Group with welding supervision services during the construction and tie-in of a 3.8 km, 450NB, Class 600 natural gas pipeline that increases the capacity of the existing Dandenong to Crib Point Pipeline system. The pipeline runs from a hot tap off take on the existing 300NB pipeline and reconnects via a hot tap to the existing 300NB pipeline. This section was the first stage of a general augmentation of the Dandenong to Crib Point Pipeline to increase capacity in the pipeline system servicing the Mornington Peninsula region, to deal with increased winter demand.

Services Provided

Welding Supervisor

SOUTH WEST LODDON PIPELINE PROJECT

South West Loddon Pipeline Project.

SOUTH WEST LODDON PIPELINE PROJECT

The $80M South West Loddon Pipeline Project is a joint initiative between GWMWater, Loddon Shire, Coliban Water, Goulburn-Murray Water, and the Victorian and Federal Governments. The project includes 1300km of water pipeline trunk & distribution network, along with 13 pumping stations, tanks and channel offtakes.

The new pipeline system extends the existing Wimmera-Mallee stock and domestic pipeline east of St Arnaud, across to Wedderburn, Inglewood and Bridgewater on Loddon north west of Bendigo, providing a more secure rural water supply to sustain a viable regional economy. The project will service 260 rural farming enterprises and 370 lifestyle properties over an area of 2900km² with a reticulated water supply.  PNP was engaged by GWMWater to undertake inspection services during construction, between February and December 2018.

The field inspector role supervised contractor activities in the field, particularly regarding quality, safety and environmental performance. Pipelines were generally DN60 – DN125 PE ploughed-in and DN150 – DN 375 PVC installed by trenching.

Services Provided

Inspector

TAYLOR LAKES PROJECT

taylor lakes project

TAYLOR LAKES PROJECT

Subsequent to our involvement on the Wimmera Malle Pipeline Project, PNP provided GWMWater with inspection services on their Taylors Lake Project.

Taylors Lake is an off-stream reservoir and a reliable water source for the region. The Lake has an important role in supplying environmental water to the Wimmera River. It’s also very popular with Horsham locals for recreation, especially fishing and water skiing. When other lakes are dry, Taylors Lake will often still have water to enjoy.

Services Provided

Inspector

$500M WIMMERA MALLEE PIPELINE PROJECT

w m pipeline

$500M WIMMERA MALLEE PIPLINE PROJECT

Wimmera Mallee irrigation area pipeline network. The Wimmera Mallee Pipeline Project was one of the largest water infrastructure projects in Australia, replacing 17,500 km of inefficient open channels with 9,159 km of rural pipeline. Construction commenced in November 2006 with the last pipe being laid in April 2010, well ahead of the 10 year timeframe originally proposed and within the $688M project budget. The pipeline saves on average 103 GL/yr of water and provides a continuous water supply to approximately 7,000 rural customers and 36 towns across the Wimmera and Mallee. PNP assisted GWMWater from the start of the tender period for Stage 1, commencing with the preparation of a recruitment plan for project.  PNP then provided inspection services on behalf of GWMWater, once construction commenced on Stage 1 in October 2006.  Followed by a Senior Cost Controller and a Contracts Administrator, to review the contractor’s work.  Additional cost, contracts and inspection personnel were provided as new supply systems began construction. This included validating subcontractor progress claims, monitoring progress, providing input to monthly reports, coordinating and discussing related matters with construction/project managers, and reviewing claims and variations.

Services Provided

HR officer,

inspectors,

cost control engineers,

contracts officer

FLEXITY E-CLASS TRAMS INTRODUCTION AND ROLLOUT, VIC

e-class tram

FLEXITY E-CLASS TRAMS INTRODUCTION AND ROLLOUT, VIC

The E-class trams are three-section, four-bogie articulated trams that were first introduced to the Melbourne tram network in 2013. They are built at Bombardier’s Dandenong factory, with the propulsion systems and bogies coming from Bombardier factories in Germany.  The first tram was delivered to the Preston workshop in June 2013 and after testing entered service on route 96 in November 2013. As of January 2019, 72 (50 E1s and 22 E2s) are in service, of a total of 90 ordered by the State.

Services Provided

PNP has been supporting Bombardier with the tram fleet since the procurement process commenced in 2009.

Bid technical support, production planners, designers, methods engineers, M&E enginers, production supervisors, HSE coordinators, trades assistants, technicians, welding inspectors, quality inspectors, supply specialists, drafters, stores staff, HR & payroll assistants, financial controller, planner/scheduler, accountant, clerks

WEST MELBOURNE VLOCITY FLEET MAINTENANCE, REPAIR AND OVERHAUL DEPOT, VIC

VLOCITY TRAIN FLEET, VIC

WEST MELBBOURNE VLOCITY FLEET
MAINTENANCE, REPAIR AND
OVERHAUL DEPOT, VIC

The VLocity DMUs maintain a high rate of availability, which ensures highly efficient rail service.

Services Provided

Purchasing officer,

storeperson,

maintenance analysts & planners,

reliability engineer,

maintenance supervisors and officers,

OH&S officer,

reliability & graduate engineers.

VLOCITY TRAIN FLEET, VIC

VLOCITY TRAIN FLEET, VIC

VLOCITY TRAIN FLEET, VIC

VLocity Diesel Multiple Unit (DMU) trains are “Made in Victoria for Victoria” with 66.5% Local Content achieved. Built locally in Dandenong, these trains operate at a maximum speed of 160 km/h, and were designed to address emerging passenger trends, safety standards and performance requirements.

Services Provided

Production planners, 

reliability engineers, 

system support engineers, 

methods engineers,  

building services engineers, 

piping engineers, 

schedulers, 

quality inspectors & officers, 

train inspectors, 

commissioning support, 

mechanics, 

electricians, 

M&E fitters, 

boilermakers, 

welders, 

trades assistants, 

coach builders, 

yard logistics, 

supply coordinators, 

purchasers, 

expeditors, drivers, 

labourers, 

service technicians, 

drafters, 

designers, 

clerks, 

document controllers, 

payroll officers, 

bid support, 

EH&S coordinators

POST TEMPLATE

South West Loddon Pipeline Project.

ARTICLE TITLE

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Fusce elementum sodales libero, et lobortis libero ultricies quis. Integer vel pretium augue. Nunc pulvinar ex ac aliquam dapibus. Nullam pretium lorem quis diam consectetur, vel iaculis ligula scelerisque. Phasellus congue lacus nec magna tristique malesuada. Nulla imperdiet nec nisi eu consectetur. Praesent non blandit dui. Nulla et convallis nisi. Mauris a feugiat arcu. Aenean tincidunt ut tellus vehicula vestibulum. Nulla a pharetra tortor. Aliquam gravida scelerisque sagittis. Donec congue fermentum lorem vitae pharetra.

Fusce eget magna diam. Donec felis mi, gravida at rhoncus ut, bibendum ac risus. Aliquam non neque sed ante volutpat eleifend at vel arcu. Duis laoreet ligula ac consequat mollis. Fusce sit amet tortor at ipsum volutpat elementum ut id magna. Donec pellentesque felis turpis, a facilisis dui eleifend quis. Morbi eget tortor aliquam nisl dapibus fringilla quis eu risus. Fusce a velit id augue vestibulum hendrerit. Duis porta urna nisi, a facilisis eros scelerisque pharetra. Sed sit amet lacus eget leo imperdiet aliquam. Duis auctor malesuada ipsum id scelerisque.

Pellentesque et feugiat elit. Donec gravida faucibus ex nec blandit. Nunc tempus quis risus at ultricies. Praesent cursus blandit massa et dictum. Vivamus et mauris et augue volutpat egestas. Nam id eros id magna sodales suscipit eu quis est. Ut vitae magna sem. Mauris a leo feugiat turpis auctor gravida. Sed semper odio in nibh rutrum, porttitor consequat leo lacinia. Vestibulum rhoncus, nibh in ultricies interdum, justo sapien tincidunt lectus, vitae hendrerit purus libero non massa.

Maecenas tempus leo in sapien interdum lobortis. Pellentesque pellentesque dolor ultrices, ullamcorper risus sed, malesuada lacus. Nulla facilisi. Proin nisl urna, accumsan id metus non, condimentum malesuada orci. Morbi tincidunt at purus ac molestie. Etiam quam libero, dictum at porta at, bibendum quis purus. Donec vehicula neque at lorem sagittis dignissim. Maecenas cursus quam ut ante elementum, sed egestas est porta.

Donec mauris risus, volutpat suscipit est ut, sagittis porttitor eros. Sed efficitur eu erat vel rutrum. Morbi placerat purus hendrerit, hendrerit lectus ut, facilisis augue. Praesent tempus enim non eros luctus, a placerat quam rutrum. Donec sit amet risus sed metus dictum congue. Aliquam sed cursus sapien, a aliquet nibh. Maecenas malesuada volutpat elit vitae congue. Quisque erat nisl, maximus ac sodales ac, iaculis eget sem. In placerat dui vitae dolor lacinia, eu elementum nulla cursus. Nulla libero lectus, porta at tincidunt id, pharetra eget eros. Duis feugiat leo eget ex tristique consectetur. Donec at venenatis tortor.