DANDENONG LNG GAS STORAGE FACILITY OPERATIONS, VIC

APA dandenong ing

DANDENONG LNG GAS STORAGE FACILITY OPERATIONS, VIC

APA’s Dandenong LNG Gas Storage Facility provides gas buyers, including gas retailers, flexibility in the East Australian gas market, by providing options to manage gas supply and demand during production outages or emergencies and peak demand periods.

Strategically located on the Melbourne Inner Ring Main, the facility is ideally situated to enable the rapid vaporisation of LNG and subsequent injection of natural gas into the pipeline system.

Natural gas is taken from the Longford Dandenong Pipeline, cleaned to remove moisture and carbon dioxide, and then cooled to -163 degrees. At this temperature it becomes a liquid which is then stored in the very large onsite above-ground LNG tank. The tank can hold 680 terajoules of LNG (12,400 tonnes) and can be topped up at a rate of up to 8.2 TJ/day. To supply gas into the East Coast gas market, the LNG is warmed to be turned back into natural gas. The combined injection capacity of the plant is 237 TJ/. This is equivalent to the average daily gas consumption of 1.5 million households. The plant can be injecting into the market at full capacity within an hour of start-up. APA also sells LNG for remote applications and heavy road transport as an alternative to diesel and LPG. The facility has an LNG tanker loading capacity of around 100 tonnes of LNG per day. The facility’s onsite control centre is manned 24 hours per day. PNP has provided APA with various personnel to undertake works and both operate the facility over the years.

Services Provided

Construction superintendent,

mechanical design draftsperson,

materials expediter,

LNG controllers

BROOKLYN-LARA GAS PIPELINE, VIC

Brooklyn-Lara Gas Pipeline, VIC

BROOKLYN-LARA GAS PIPELINE, VIC

Following on from our preliminary work for construction contractor, AJ Lucas, PNP assisted the asset owner during delivery of the construction phase. PNP fulfilled construction inspection services for APA Group during construction of the project, which went from October 2007 to mid 2008.

Services Provided

Clear & grade inspector,

welding inspectors,

coating inspectors,

lower-in inspector,

backfill inspector,

Document Controller

ABBOTTS ROAD AUGMENTATION PIPELINE, DANDENONG, VIC

Abbott's Road

ABBOTT'S ROAD PROJECT

PNP provided APA Group with welding supervision services during the construction and tie-in of a 3.8 km, 450NB, Class 600 natural gas pipeline that increases the capacity of the existing Dandenong to Crib Point Pipeline system. The pipeline runs from a hot tap off take on the existing 300NB pipeline and reconnects via a hot tap to the existing 300NB pipeline. This section was the first stage of a general augmentation of the Dandenong to Crib Point Pipeline to increase capacity in the pipeline system servicing the Mornington Peninsula region, to deal with increased winter demand.

Services Provided

Welding Supervisor